J100-7C 24VDC Electric Automatic Grease Lubrication Pumps

The J100 series electric piston pump unit is a device for single-line centralized lubrication systems, featuring compact design, quick replacement of lubricant cartridges, dual outlet lubricant delivery, automatic control system and precise output lubricant.

Description

Features

– Electric drive: The electric motor drives the piston pump unit of the J100 lubrication pump, and via an eccentric, it drives the delivery piston in the axial direction.
– Lubricant delivery: The delivery piston pushes the lubricant from the lubricant cartridge or oil reservoir of the lubrication pump via an internal control valve to the lubricant outlet.
– Pressure relief: Following the lubrication cycle, on switching off the lubrication pump motor, a pressure relief valve releases the system pressure required by single-line metering devices.
– Pressure limitation: The integrated pressure limiting valve limits the maximum system pressure of the centralized lubrication system to 80 bar.
– Lubricant supply: The lubricant can be supplied via a disposable lubricant cartridge or oil reservoir.
– Fill level monitoring: The J100 lubrication pump can be optionally fitted with a fill level switch to monitor the minimum fill level.

Specification

Model J100-3C
Lubrication time PLC or external controller
Interval time PLC or external controller
Operating temperature 0℃~ +50°C (Low temperature conditions require antifreeze grease)
Number of outlets 1 or 2
Reservoir capacity 0.3L, 0.5L, 0.7L, 1.5L
Refilling Filling port/removable/cartridge
Lubricant NLGI 000#~2#
Pressure relief valve Optional
Discharge 15 mL/min
Max. operating pressure 8.0 MPa
Connection thread Outlet Φ6
Operating voltage 24VDC
Certification CE
Low level switch N.C. contact

Maintenance

– Check lubricant levels: Check regularly based on number of pump cycles and setup of system.
– System leak check: A check for leaks in system components during every fill of pump and fix those found immediately.
– Electrical Safety: The cables of the electric lubrication pump should be inspected on a regular basis for any damages. All electrical work, such as repair and modification, shall be performed by a qualified technician after power removal.
– Cleaning and contamination prevention: Use a compatible cleaning agent to avoid contamination of the J100 lubrication pump.
– Follow safe procedures: Before starting any maintenance, cleaning, or repairs on the pump, ensure the following safety measures are strictly followed: removal of power, depressurization, locking/tagging equipment, and personal protective equipment.

Manuals