J100-7C 24VDC Electric Automatic Grease Lubrication Pumps
The J100 series electric piston pump unit is a device for single-line centralized lubrication systems, featuring compact design, quick replacement of lubricant cartridges, dual outlet lubricant delivery, automatic control system and precise output lubricant.
Opis
Cechy
– Electric drive: The electric motor drives the piston pump unit of the J100 lubrication pump, and via an eccentric, it drives the delivery piston in the axial direction.
– Lubricant delivery: The delivery piston pushes the lubricant from the lubricant cartridge or oil reservoir of the lubrication pump via an internal control valve to the lubricant outlet.
– Pressure relief: Following the lubrication cycle, on switching off the lubrication pump motor, a pressure relief valve releases the system pressure required by single-line metering devices.
– Pressure limitation: The integrated pressure limiting valve limits the maximum system pressure of the centralized lubrication system to 80 bar.
– Lubricant supply: The lubricant can be supplied via a disposable lubricant cartridge or oil reservoir.
– Fill level monitoring: The J100 lubrication pump can be optionally fitted with a fill level switch to monitor the minimum fill level.
Specyfikacja
Model | J100-3C |
Czas smarowania | PLC or external controller |
Czas interwału | PLC or external controller |
Temperatura pracy | 0℃~ +50°C (Low temperature conditions require antifreeze grease) |
Liczba wyjść | 1 or 2 |
Pojemność zbiornika | 0.3L, 0.5L, 0.7L, 1.5L |
Uzupełnianie | Filling port/removable/cartridge |
Smar | NLGI 000#~2# |
Pressure relief valve | Optional |
Wypisać | 15 mL/min |
Maksymalne ciśnienie robocze | 8.0 MPa |
Gwint przyłączeniowy | Wylot Φ6 |
Napięcie robocze | 24 V prądu stałego |
Orzecznictwo | CE |
Przełącznik niskiego poziomu | Kontakt NC |
Konserwacja
– Check lubricant levels: Check regularly based on number of pump cycles and setup of system.
– System leak check: A check for leaks in system components during every fill of pump and fix those found immediately.
– Electrical Safety: The cables of the electric lubrication pump should be inspected on a regular basis for any damages. All electrical work, such as repair and modification, shall be performed by a qualified technician after power removal.
– Cleaning and contamination prevention: Use a compatible cleaning agent to avoid contamination of the J100 lubrication pump.
– Follow safe procedures: Before starting any maintenance, cleaning, or repairs on the pump, ensure the following safety measures are strictly followed: removal of power, depressurization, locking/tagging equipment, and personal protective equipment.