J100-7C 24VDC Electric Automatic Grease Lubrication Pumps

The J100 series electric piston pump unit is a device for single-line centralized lubrication systems, featuring compact design, quick replacement of lubricant cartridges, dual outlet lubricant delivery, automatic control system and precise output lubricant.

Deskripsi

Fitur

– Electric drive: The electric motor drives the piston pump unit of the J100 lubrication pump, and via an eccentric, it drives the delivery piston in the axial direction.
– Lubricant delivery: The delivery piston pushes the lubricant from the lubricant cartridge or oil reservoir of the lubrication pump via an internal control valve to the lubricant outlet.
– Pressure relief: Following the lubrication cycle, on switching off the lubrication pump motor, a pressure relief valve releases the system pressure required by single-line metering devices.
– Pressure limitation: The integrated pressure limiting valve limits the maximum system pressure of the centralized lubrication system to 80 bar.
– Lubricant supply: The lubricant can be supplied via a disposable lubricant cartridge or oil reservoir.
– Fill level monitoring: The J100 lubrication pump can be optionally fitted with a fill level switch to monitor the minimum fill level.

Spesifikasi

Model J100-3C
Waktu pelumasan PLC atau pengontrol eksternal
Waktu jeda PLC atau pengontrol eksternal
Suhu operasi 0℃~ +50°C (Kondisi suhu rendah memerlukan minyak antibeku)
Jumlah outlet 1 atau 2
Kapasitas waduk 0,3 liter, 0,5 liter, 0,7 liter, 1,5 liter
Mengisi ulang Port pengisian/dapat dilepas/kartrid
Pelumas Bahasa Indonesia: NLGI000#~2#
Katup pelepas tekanan Opsional
Memulangkan 15 mL/menit
Tekanan operasi maks. Tekanan 8,0 MPa
Benang koneksi Saluran keluar Φ6
Tegangan operasi Tegangan 24VDC
Sertifikasi CE
Sakelar level rendah kontak NC

Pemeliharaan

– Check lubricant levels: Check regularly based on number of pump cycles and setup of system.
– System leak check: A check for leaks in system components during every fill of pump and fix those found immediately.
– Electrical Safety: The cables of the electric lubrication pump should be inspected on a regular basis for any damages. All electrical work, such as repair and modification, shall be performed by a qualified technician after power removal.
– Cleaning and contamination prevention: Use a compatible cleaning agent to avoid contamination of the J100 lubrication pump.
– Follow safe procedures: Before starting any maintenance, cleaning, or repairs on the pump, ensure the following safety measures are strictly followed: removal of power, depressurization, locking/tagging equipment, and personal protective equipment.

Buku Panduan