Bombas de lubricación automática con grasa eléctrica de 24 V CC J100-7C
The J100 series electric piston pump unit is a device for single-line centralized lubrication systems, featuring compact design, quick replacement of lubricant cartridges, dual outlet lubricant delivery, automatic control system and precise output lubricant.
Descripción
Características
– Electric drive: The electric motor drives the piston pump unit of the J100 lubrication pump, and via an eccentric, it drives the delivery piston in the axial direction.
– Lubricant delivery: The delivery piston pushes the lubricant from the lubricant cartridge or oil reservoir of the lubrication pump via an internal control valve to the lubricant outlet.
– Pressure relief: Following the lubrication cycle, on switching off the lubrication pump motor, a pressure relief valve releases the system pressure required by single-line metering devices.
– Pressure limitation: The integrated pressure limiting valve limits the maximum system pressure of the centralized lubrication system to 80 bar.
– Lubricant supply: The lubricant can be supplied via a disposable lubricant cartridge or oil reservoir.
– Fill level monitoring: The J100 lubrication pump can be optionally fitted with a fill level switch to monitor the minimum fill level.
Especificación
Modelo | J100-3C |
Tiempo de lubricación | PLC o controlador externo |
Tiempo de intervalo | PLC o controlador externo |
Temperatura de funcionamiento | 0℃~ +50°C (Las condiciones de baja temperatura requieren grasa anticongelante) |
Número de puntos de venta | 1 o 2 |
Capacidad del depósito | 0,3 l, 0,5 l, 0,7 l, 1,5 l |
Recarga | Puerto de llenado/extraíble/cartucho |
Lubricante | Número de modelo NLGI 000#~2# |
Válvula de alivio de presión | Opcional |
Descargar | 15 ml/min |
Presión máxima de funcionamiento | 8,0 MPa |
Hilo de conexión | Salida Φ6 |
Voltaje de funcionamiento | 24 V CC |
Proceso de dar un título | CE |
Interruptor de nivel bajo | Contacto NC |
Mantenimiento
– Check lubricant levels: Check regularly based on number of pump cycles and setup of system.
– System leak check: A check for leaks in system components during every fill of pump and fix those found immediately.
– Electrical Safety: The cables of the electric lubrication pump should be inspected on a regular basis for any damages. All electrical work, such as repair and modification, shall be performed by a qualified technician after power removal.
– Cleaning and contamination prevention: Use a compatible cleaning agent to avoid contamination of the J100 lubrication pump.
– Follow safe procedures: Before starting any maintenance, cleaning, or repairs on the pump, ensure the following safety measures are strictly followed: removal of power, depressurization, locking/tagging equipment, and personal protective equipment.